Wagga Foundation Repairs is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

The weak point of most extensions is the line where new footings meet old ones. The existing house has had years to settle, while the new footings sit on freshly disturbed ground and may sit on soil that behaves differently. If the two parts are joined rigidly and then move by different amounts, the junction cracks. The answer is an engineer’s design for that junction, based on a soil test of the extension area and an assessment of how the existing footings are performing.

Why old and new footings move differently

The CSIRO homeowner guide to foundation maintenance describes two kinds of settlement after construction: immediate settlement as the soil compacts under the new load, and consolidation settlement in clay, which “will usually take place during the first few months after construction” but has been known to take many years in exceptional cases. An existing house is well past that stage; a new extension is not.

The ground under the extension may also differ: an old garden bed, filled ground or the site of a demolished shed. CSIRO notes that settlement tends to be uneven because of differing compaction and differing moisture content of the soil before construction.

The engineer’s two main options

Engineers generally choose between two approaches for the junction, depending on the soil, the existing footings and the type of extension:

  • Separate the structures. The extension gets its own footing system and the junction is detailed to let each part move independently, with a movement joint carried through walls, flashings and internal finishes.
  • Tie them together. The new footings are designed to work with the old ones, for example by connecting reinforcement into the existing footing, so the two behave as one. This relies on the existing footings performing well and the soil being similar under both parts.

Which suits a particular house is a design decision for the structural engineer; ask to see the junction detail on the drawings before work starts.

Soil testing for the extension area

The NCC 2022 Housing Provisions require sites classified H, E or P to follow AS 2870 for footing design and construction (ABCB, NCC 2022 Housing Provisions Part 4.2). AS 2870-2011, Residential slabs and footings, sets out how a site is classified and how footings are designed (Standards Australia store); its classes run from A (most sand and rock sites) through S, M, H1 and H2 to E (extremely reactive), as reproduced by CSIRO.

The site class comes from a geotechnical report for the ground in question; CSIRO says “generally soil classification is provided by a geotechnical report”. An old report for the original house may not reflect the extension footprint. NSW soil survey maps rate most land under Wagga’s suburbs as low to moderate foundation hazard, locally higher near drainage lines and on saline or sloping ground, and the survey recommends geotechnical advice before developing land with a moderate or high hazard (Soil Landscapes of the Wagga Wagga 1:100,000 Sheet). The guide to reading a soil classification report explains the terms.

For cost, a 2022 iSeekPlant soil testing guide says footing probes for an additional storey or extension “start at $150.00 which includes the GST”, per probe. That figure is from 2022; a current quote is the number to rely on.

Check the existing footings first

If the existing house is already moving, adding an extension can add load and change how water reaches the soil. A foundation inspection before the extension is designed shows whether the existing footings need repair, such as underpinning, as part of the project. A second storey adds load the engineer must check.

Excavating next to existing footings is itself a risk. CSIRO says “excavation around footings must be properly engineered”, because removing soil from under a footing’s angle of support causes subsidence. Lodge a free Before You Dig Australia enquiry before any digging.

Verandah enclosures

Enclosing a verandah turns a lightly built structure into a habitable room with new wall and floor loads. The original verandah footing may not have been designed for that, so ask the engineer to assess it; the verandah and outbuilding restumping page covers repairs to those footings.

Approvals, licences and contracts

  • Planning approval. If a project meets the exempt development standards it may not need planning approval; if not, it needs a complying development certificate or a development application (NSW Planning, Exempt development). Ask Council or an accredited certifier which applies; the guide to council approval for underpinning covers the same pathways.
  • Council sewer and stormwater. Building over or near a Wagga Wagga City Council sewer or stormwater main needs a separate application with “Detailed structural designs of footings”, and that permit is not development consent (Building Near Sewer or Stormwater Lines).
  • Contract and insurance. Residential building work over $5,000 including GST needs a written contract, and the deposit must not exceed 10% (NSW Government, Contracts). Over $20,000 including GST, the contractor must hold home building compensation cover before starting work or taking a deposit, unless the project is exempt (Service NSW).

Published prices for foundation repair work are in the underpinning cost guide.

Frequently asked questions

My builder wants to join the new slab straight to the old one. Is that right?

It can be, if the engineer has designed it that way for your soil and existing footings. Ask whether a structural engineer has detailed the junction and to see the drawing.

Do I need a new soil test if the house had one when it was built?

Often, yes. The original test covered the original footprint, and the extension area may have been gardened, filled or disturbed since. The engineer specifies what testing the design needs.

Request a quote for an inspection of the existing footings before your extension is designed; if the enquiry is referred, an independent licensed contractor contacts you directly.

Sources

Last reviewed 16/11/2026. How these pages are researched and corrected.

More guides

Foundation Repair FAQs for Wagga Wagga and the Riverina

Short, sourced answers to common foundation repair questions in Wagga Wagga and the Riverina: soils, cracks, costs,…

View

Murrumbidgee Flood Risk and What It Does to Your Foundation

What flooding and saturated clay can do to footings near the Murrumbidgee, what NSW SES says about returning home,…

View

Floor Level Survey: How Millimetre Mapping Works

What a floor level survey measures, how dishing, doming and a dropped corner show up on the plan, and the NSW…

View

More on this topic

Request a quote

Tell us about the job and an independent local contractor can quote it.

Get a Quote