An NSW owner-builder permit lets you do or supervise building work on your own home without contracting a licensed builder, but it is tied to work that has a development approval or complying development certificate, and it does not let you do specialist work such as plumbing or drainage. For underpinning, the bigger constraints are practical: an engineer still sets the scope, digging under a footing is high-risk work, and you carry a builder’s responsibilities for the result.
This guide sets out what the NSW Government says, and what to confirm with NSW Fair Trading, Council or a certifier before you commit.
When an owner-builder permit applies
The NSW Government says you need a permit when the reasonable market cost of the work, labour and materials, is over $10,000 including GST and you are not contracting a licensed builder to do it. No permit is needed for work that does not require a development application (DA) or complying development certificate (CDC).
That second point matters for underpinning. Whether a particular underpinning job needs approval depends on the scope and the property, and no official page found says either way, so ask Council or an accredited certifier first (NSW Planning, Exempt development). The council approval guide covers the pathways.
To apply, the NSW Government lists a copy of the approved DA or CDC, a current general construction induction card (white card) and, for work valued at more than $20,000, approved owner-builder education.
What the permit does not cover
- Specialist work. Plumbing, drainage, gasfitting and electrical wiring “cannot be done under an owner-builder permit” unless you hold that licence (NSW Government, Working as an owner-builder). Downpipe, stormwater and sewer changes that often go with foundation repair fall here.
- Hiring trades. You need a written contract with a licensed tradesperson where the work is over $5,000, and knowingly engaging an unlicensed contractor is an offence. Underpinning and piering is its own licence category, and contractors need that licence for work valued at more than $5,000 including GST.
- Responsibility. The NSW Government says an owner-builder is responsible for the work “just as a fully licensed builder would be”.
Whether a permit lets you dig and pour the underpins yourself is a question for NSW Fair Trading and your certifier; this site does not answer it.
The engineer and excavation safety
The scope of underpinning (how many piers, where, how deep and by which method) comes from a structural engineer’s assessment, usually with a soil report; the engineer’s report guide explains what that document contains.
Digging under a footing is where the risk sits. SafeWork NSW’s Code of Practice: Excavation work says excavation below the level of a footing that could affect the structure’s stability should be assessed by a competent person and secured by a ground support system designed by a competent person. Work in or near a trench deeper than 1.5 metres is high-risk construction work that needs a safe work method statement. As an owner-builder you also carry duties under the Work Health and Safety Act 2011.
Before anyone digs, lodge a free enquiry with Before You Dig Australia; its plans are indicative only and are not approval to excavate.
Insurance and selling later
- Home building compensation (HBC) cover is not available for owner-builder work. A licensed contractor you engage must provide it where the contract price is over $20,000, and you should receive the certificate before work starts or any money is paid.
- If you sell within 7 years and 6 months of the permit being issued, the sale contract must include a consumer warning, and the next owner gets the benefit of the statutory warranties on your work (same NSW Government page).
Getting quotes for the structural part
Many owner-builders run the project and contract a licensed underpinning contractor for the structural work. Give each contractor the same engineer’s design so the quotes price the same scope. The underpinning cost guide lists published price ranges with their publishers, and the guide to why underpinning quotes vary explains the line items; the underpinning service page covers methods and the paperwork a quote should come with.
Request a quote for the structural work; if your enquiry is referred, an independent licensed contractor contacts you directly.
Owner-builder underpinning FAQs
Do I need an owner-builder permit to underpin my own house?
Only if the work is valued at over $10,000 including GST, needs a DA or CDC, and you are not contracting a licensed builder to do it (NSW Government). Ask Council or a certifier whether your job needs approval.
Can an owner-builder do the drainage work that goes with underpinning?
Not under the permit. Drainage and plumbing are specialist work that needs a licensed tradesperson unless you hold that licence yourself (NSW Government, Working as an owner-builder).
Do I still need an engineer’s report as an owner-builder?
Yes in practice. The engineer’s design sets the pier count, depth and method that any approval, certifier and contractor will work from, whoever holds the permit.
Sources
- NSW Government, When an owner-builder permit is needed: threshold, DA/CDC condition, specialist work; checked 15/11/2026
- NSW Government, How to apply for an owner-builder permit: white card, education over $20,000, documents; checked 15/11/2026
- NSW Government, Working as an owner-builder: responsibilities, contracts, HBC, resale warning; checked 15/11/2026
- NSW Government, Underpinning and piering work: licence category and threshold; checked 15/11/2026
- NSW Planning, Exempt development: approval pathways; checked 16/11/2026
- SafeWork NSW, Code of Practice: Excavation work (January 2020, PDF): sections 1 and 3.5; checked 15/11/2026
- Before You Dig Australia, For Homeowners: free enquiry and limits of plans; checked 15/11/2026