Why Underpinning Quotes Vary So Much, And How to Compare Them

Wagga Foundation Repairs is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

Underpinning quotes for the same house usually differ because they are not pricing the same job. One contractor has allowed for more piers or deeper ones, another has priced a different method, and a third has left out engineering, spoil removal or making good. The way to compare them is to give every contractor the same engineer’s scope, then line the quotes up item by item rather than by the total.

The method changes the unit, not just the price

Underpinning can mean mass concrete pits, beam and base, steel screw piers or injected resin, and publishers price them in different units. Airtasker’s foundation repair guide (published 15 October 2026) gives $1,500-$3,000 per linear metre for traditional underpinning but $3,500-$12,000 per house for resin injection underpinning, GST not stated. A quote for so many concrete pits and a quote for so many screw piers cannot be lined up until both are tied to the same engineer’s design. The screw pile versus concrete guide explains how those two methods differ, and the underpinning cost guide has the full table of published figures. No publisher found lists a Wagga or Riverina price.

Who decided the pier count and depth?

The number of piers and how deep they go drive most of the price. On a properly scoped job a structural engineer sets them from an inspection and, usually, a soil report: the soil report gives the site’s AS 2870 class, from A (most sand and rock sites) to E (extremely reactive), per the CSIRO guide reproducing AS 2870-2011 Table 2.1. A quote priced from photos or a phone description is a contractor’s estimate, and if the crew later finds the job needs more or deeper piers, the difference comes back as a variation.

So ask what document each quote is priced from. The engineer’s report guide covers what that document should contain, and a foundation inspection is the usual starting point.

What to check in each quote

ItemWhat to check
Engineer’s design and soil reportIncluded, priced separately, or not mentioned
Method, number and position of piersMatches the engineer’s design
Assumed depth to bearingStated, with the rate if the engineer requires deeper
Pricing unitPer pier, per metre or fixed price, and whether GST is included
Access and excavationMachine or hand digging, fences or paving removed
SpoilRemoval and disposal included or extra
Making goodCrack repair, brickwork, render, paths, paving and gardens
Drainage or plumbingIncluded, and who is licensed to do it
Approvals and enquiriesCouncil or certifier, Section 68 if drains move, Before You Dig Australia
Provisional sumsWhat each covers and what triggers it
Engineer inspections and sign-offIncluded and documented at completion

A lump sum with none of this broken out is the hardest to compare; ask for an itemised version.

Provisional sums and variations

A provisional sum is an allowance for work that cannot be priced until digging starts, such as rock, groundwater, an old footing or buried services. It can rise, so a low quote with small provisional sums may not stay low. Ask what each allowance covers and how the final figure will be worked out.

Changes to the agreed work are variations. NSW rules say variations must be in writing and signed by both parties, and progress payments must match the work carried out (NSW Government, Contracts for residential building work). If the contract price is not known or may change, the contract must include a warning explaining why (Guide to providing home building contracts).

Warning signs in a low quote

  • A firm price with no inspection. Without a site visit or engineer’s design, the pier count is a guess.
  • No engineering. Ask who designs and signs off the work.
  • Exclusions buried at the end. Making good, spoil and drainage are common gaps.
  • A large upfront payment. The deposit must not exceed 10% of the contract price (NSW Government, Contracts for residential building work).
  • No insurance certificate on a bigger job. Where the contract price is over $20,000 including GST and the project is not exempt, the contractor must hold home building compensation cover before starting work or taking any money (Service NSW).
  • A licence that does not match the work. Check the name and licence on NSW Fair Trading’s licence check; underpinning and piering is its own licence category.

A higher quote is not automatically better either. The contractor checklist has more questions to ask.

How to line up three quotes

  1. Give every contractor the same engineer’s design.
  2. Make a table with one row per item above and one column per quote; mark each item included, excluded or unclear.
  3. Ask each contractor in writing to clear up the unclear items.
  4. Compare totals only once each quote covers the same scope.

Frequently asked questions

Is it normal for underpinning quotes to differ a lot?

Yes, when they price different methods, pier counts or inclusions. Publishers even use different units: Airtasker gives traditional underpinning per linear metre and resin injection per house, so totals only compare fairly on the same scope.

Should I take the cheapest underpinning quote?

Only if it covers the same engineer’s scope, pier count, depth and making good as the others. A low total that relies on small provisional sums or exclusions can end up higher once variations are added.

Do I need my own engineer’s report before collecting quotes?

It is not always required, but it means every contractor prices the same brief, which makes the quotes comparable.

Request a quote: if your enquiry is referred, an independent licensed contractor inspects and quotes in their own name.

Sources

Last reviewed 15/11/2026. How these pages are researched and corrected.

More guides

Agi Drains and Surface Grading Around Footings

What an agi (subsoil) drain does around a footing, why surface grading comes first, and the NSW licence and Wagga…

View

Renovating a Bathroom on a Timber-Floor Wagga Home: Why Levelling Comes First

Renovating a bathroom on a sloping timber floor: how to tell a structural slope, why the subfloor is fixed before…

View

Best Time of Year to Underpin a House in Wagga

Does the season matter for underpinning in Wagga Wagga? What it changes (digging, weather days, reading cracks) and…