Lean-tos, skillions and verandahs often sit on their own posts or stumps, sometimes added years after the house and on lighter footings, so they can sag, tilt or pull away while the main house is sound. The usual fixes are restumping and re-levelling the addition, correcting any water problem around it, and then repairing the junction with the house. Cost is driven mainly by the number of stumps, the material, access and what is found under the floor.
Why additions move separately
- Separate, often lighter footings. An addition’s stump line does not necessarily share the house’s founding depth or condition, and add-ons were not always built to the same standard; see restumping verandahs and outbuildings.
- They sit on the edge. CSIRO’s homeowner guide says seasonal swelling and shrinkage of clay “affects the perimeter of the building first” (CSIRO, Foundation Maintenance and Footing Performance). A verandah is all perimeter.
- Isolated posts and piers. CSIRO says isolated piers affected by erosion or saturation “will eventually lose contact with the bearers they support and may tilt or fall over”, and floors that lose that support “become bouncy”.
- Water at the drip line. Roof water from a lean-to or an overflowing gutter concentrated on a small area of soil can cause erosion and saturation next to footings, and CSIRO names downpipes not connected to the stormwater system as a cause of “large-scale problems”.
- Timber decay. Timber posts and stumps kept damp at ground level deteriorate; Junee Shire Council notes, in a salinity context, that “Timber piers rot more quickly than normal due to dampness under floors” (Junee Shire Council, Salinity in Junee Shire).
- The connection. Where a lean-to is fixed to the house wall, any rotation or sinking of the addition stresses that joint, so the first sign is often a gap along the roofline or a crack where the two meet.
Signs of failure
- a lean-to or verandah floor sloping away from the house, or bouncy along its outer edge
- a widening gap at the junction of the addition roof and the house fascia or wall
- verandah posts leaning, wobbling or rotted at the base
- doors in the addition that bind, drop or will not latch
- cracking in a rendered or brick addition at corners or the junction
The verandah pulling away guide goes into the junction signs. One sign alone may be minor; several together on an older addition are worth an inspection.
How it is usually repaired
- Inspection. A foundation inspection establishes which stumps or footings have failed, how far the addition has moved, and whether the main house is involved. An engineer is brought in where the movement looks structural or the addition is on a slab.
- Fix the water. Downpipes, gutters, surface drainage and leaks around the addition, so the new footings are not sitting in the same problem.
- Restump and re-level. The addition is supported, failed stumps are replaced on new footings, and the floor is re-levelled. Concrete or galvanised steel stumps are compared in the stump material guide. A slab-on-ground lean-to may need underpinning instead.
- Repair the junction. Re-fix, flash and seal the connection to the house, and replace rotted bearers or joists found once the old stumps are out.
If the addition is being rebuilt or enlarged rather than repaired, the extension tie-in guide is the better starting point.
What does it cost?
No publisher prices verandah or lean-to work separately, and none lists a Wagga price. The closest published figures are national restumping rows. whatsthedamage’s guide (updated November 2026) lists concrete stump replacement at $180-$480 per stump, typical $320, and partial restumping or a spot relevel of 5-10 stumps at $2,200-$5,600, typical $3,600, prices including GST.
What pushes a job up: more stumps, low clearance or tight access, replacing rotted bearers and joists, drainage work, and repairing the junction, cladding or roof flashing. Set-up and travel do not shrink with stump count, so a small job costs more per stump. The underpinning cost guide has the full table of published figures.
NSW rules
A contractor licence is needed for residential building or trade work, including underpinning and piering, valued at more than $5,000 including GST, and over that figure the job needs a written contract with a deposit of no more than 10% (NSW Government, Underpinning and piering work; NSW Government, Contracts). Check the licence on NSW Fair Trading’s licence check.
Frequently asked questions
My verandah has dropped noticeably over the years. Is that normal?
Gradual sinking means the footings or posts have been moving, often from decay or wetting at the base, and it tends to continue until the cause is fixed. An inspection tells you whether it is the addition alone or the house as well.
Do I need council approval to restump a verandah?
It depends on the scope and the structure. Ask Wagga Wagga City Council or an accredited certifier before work starts, especially if the height, size or structure will change (NSW Planning, Exempt development).
Can I pack or jack up the lean-to myself?
CSIRO warns that filling the gap between a bearer and a pier with blocking can push the floor “up into an accentuated dome” when the soil next swells, and recommends fine wedges and fortnightly monitoring if blocking is unavoidable (CSIRO). Jacking a structure without a support plan risks a sudden drop; restumping is licensed work above the threshold.
Request a quote to have an independent licensed contractor inspect the addition and the house.
Sources
- CSIRO, Foundation Maintenance and Footing Performance (2024, PDF): perimeter movement, isolated piers, roof water, blocking warning; checked 15/11/2026
- Junee Shire Council, Salinity in Junee Shire: timber piers and dampness (undated case study); checked 15/11/2026
- whatsthedamage, Restumping & reblocking cost: per-stump and partial restump prices (updated November 2026); checked 15/11/2026
- NSW Government, Underpinning and piering work: licence threshold; checked 15/11/2026
- NSW Government, Contracts for residential building work: written contract and deposit cap; checked 15/11/2026
- NSW Fair Trading, Home building licence check; checked 15/11/2026
- NSW Planning, Exempt development: approval pathways; checked 16/11/2026