Removing a pool close to the house can affect the footings in two ways: the backfilled hole is a different material from the ground around it and can settle if it is not compacted properly, and the ground moisture beside the house changes once the pool and any leaks are gone. In NSW, where a pool is removed under a complying development certificate, the Demolition Code requires the piping to be removed and the site restored to the adjoining ground level with compacted fill. A baseline inspection before demolition, a written fill and compaction specification, and some monitoring afterwards cover most of the risk.
Approvals and the compacted fill rule
NSW Planning says demolition of detached development, including swimming pools, can be done under a complying development certificate (CDC) issued under the Demolition Code, and that where demolition involves removing a pool, “any piping must be removed” and the site restored to the ground level next to the pool with compacted fill. If the job does not fit the code, it needs a development application instead; ask Council or an accredited certifier which pathway applies before work starts.
All NSW pool owners must register their pool on the Swimming Pool Register; ask Council how to update the register once the pool is gone.
How removal can affect the house
The backfill
Whether the shell is broken up and taken away or broken in place and filled, the old pool becomes a zone of placed fill next to undisturbed ground. Fill that is not placed and compacted properly can keep settling, and if the house footing sits close to the edge of that zone, the two can move differently. The guide to building on fill explains why fill behaves differently from natural ground.
Whether a partial removal (shell left in the ground) is acceptable is a question for the certifier or Council, not the demolition contractor.
The moisture change
A pool, and especially a leaking one, can keep the ground beside it wetter than the rest of the block. Once it is gone, that ground can dry out; once the area is open soil, rain soaks in where it did not before. Either change can make the ground under a nearby footing shrink or swell, which is why cracks can appear months after the job. The guide to heave and settlement signs explains how to tell the two apart, and the pool leak guide covers the leak side.
How much this matters depends on how close the pool is, how the house is built and the soil. NSW soil survey maps rate most of the land under Wagga’s suburbs as low to moderate foundation hazard, locally higher near drainage lines and on saline or sloping ground (Soil Landscapes of the Wagga Wagga 1:100,000 Sheet); only a site soil test gives your home’s AS 2870 class.
Before the pool comes out
- Record a baseline. A foundation inspection before demolition documents existing cracks and floor levels, so any later movement can be measured against it rather than argued about.
- Get the fill specified in writing. Ask what material will go in, how it will be placed and compacted, and what compaction records or test results you will receive.
- Check for services. Lodge a free enquiry with Before You Dig Australia; its plans are indicative only and may not show detail inside the property boundary.
- Plan the drainage. The finished surface should shed water away from the house, not towards it. CSIRO’s homeowner guide recommends a paving apron around the house of at least 900 mm, more in highly reactive soil, with a fall of at least 1:60 away from the walls. See drainage and moisture correction.
- If the house already has cracking, have it assessed first, so pre-existing movement and any new movement are not confused.
After the pool is gone
- Measure and photograph the existing cracks, with the date, and check them again over the following seasons.
- Watch for doors and windows on the pool side starting to stick.
- Check that the new surface drains away from the house after heavy rain.
- If cracks widen or new ones appear on that side, get an inspection; comparing against the baseline makes the cause easier to establish.
Costs
Pool demolition and any foundation work are priced separately. The demolition price depends on the pool type, full or partial removal, access for machinery, the fill and its compaction, and disposal. If foundation repair is needed later, the underpinning cost guide lists published figures.
Request a quote for a foundation inspection before or after removal; if your enquiry is referred, an independent licensed contractor contacts you directly.
Pool removal FAQs
Can the pool rubble be used as fill?
Ask the certifier what fill is acceptable for your approval. The Demolition Code requires the site to be restored with compacted fill, so whatever goes in should be placed and compacted to a written specification, with records you keep.
Do I need approval to remove a pool?
NSW Planning describes pool demolition under a complying development certificate, with a development application where the code does not fit (NSW Planning, Demolition of buildings). Ask Council or an accredited certifier which applies to your pool before work starts.
Will home insurance cover cracking after pool removal?
It depends on the policy wording, so ask your insurer in writing.
Sources
- NSW Planning, Demolition of buildings: CDC for pool demolition, piping removal and compacted fill (updated 23 March 2026); checked 15/11/2026
- NSW Government, Owning a pool or spa: your obligations: Swimming Pool Register (updated 16 March 2026); checked 15/11/2026
- CSIRO, Foundation Maintenance and Footing Performance (2024, PDF): paving apron width and fall; checked 15/11/2026
- Before You Dig Australia, For Homeowners: free enquiry and limits of plans; checked 15/11/2026
- NSW Government SEED, Soil Landscapes of the Wagga Wagga 1:100,000 Sheet: foundation hazard ratings; checked 15/11/2026