Some movement after a new house is built is expected: CSIRO’s homeowner guide says consolidation settlement of clay usually happens “during the first few months after construction”, and fine cracks under 1 mm are classed by AS 2870 as needing no repair. What is not normal is cracking that keeps widening, cracks of about 5 mm or more, doors that stop closing, or brickwork cracking externally. Those are worth recording and reporting to the builder in writing, because NSW statutory warranties cover defects in a new home for set periods.
Why new homes move
CSIRO’s homeowner guide describes two kinds of settlement from construction (CSIRO, Foundation Maintenance and Footing Performance):
- Immediate settlement, when the building is first placed on its foundation soil and the soil compacts under its weight; granular, particularly sandy, soil is more susceptible.
- Consolidation settlement, a feature of clay soil, which “will usually take place during the first few months after construction but has been known to take many years in exceptional cases”.
CSIRO notes this settlement tends to be uneven, because compaction and moisture differ across the site before building, and that these problems “may be the province of the builder”. After construction settlement ends, it says, “cracking will usually remain unchanged”.
New gardens and watering change the picture too. CSIRO says watering of garden plants, shrubs and trees “causes some of the most serious water problems”, and recommends a paved apron at least 900 mm wide around the house with a fall away from it, and lighter-watered plants next to the walls.
What AS 2870 does
AS 2870-2011 Residential slabs and footings (currently under revision) “sets out requirements for the classification of a site and the design and construction of a footing system” for a house (Standards Australia, AS 2870-2011). Sites classed H, E or P must follow it under the National Construction Code (ABCB, NCC 2022 Housing Provisions Part 4.2). The class comes from a site soil test, which the builder or designer should have; ask for a copy. NSW soil survey maps rate most of the land under Wagga’s suburbs as low to moderate foundation hazard, locally higher near drainage lines and on saline or sloping ground (Soil Landscapes of the Wagga Wagga 1:100,000 Sheet); only the site test gives a home’s class. The soil testing guide explains the report.
A footing designed to AS 2870 is designed to tolerate some ground movement, not to prevent all cracking.
Which cracks matter
CSIRO reproduces AS 2870-2011 Table C1 for walls:
| Category | Approximate crack width | Typical damage (shortened) |
|---|---|---|
| 0 Negligible | under 0.1 mm | Hairline cracks |
| 1 Very slight | under 1 mm | Fine cracks which do not need repair |
| 2 Slight | under 5 mm | Noticeable but easily filled; doors and windows stick slightly |
| 3 Moderate | 5 to 15 mm, or a number of cracks 3 mm or more in one group | Repairable; doors and windows stick; service pipes can fracture |
| 4 Severe | 15 to 25 mm | Extensive repair; frames distort; walls lean or bulge |
Source: CSIRO, reproducing AS 2870-2011 Table C1 with permission of Standards Australia.
The table describes damage, not whether a builder is liable. Width alone is not the whole story: whether a crack is still growing matters as much. Measure and date-photograph cracks; the crack monitoring guide explains simple methods, and when wall cracks matter covers the patterns.
Your rights with a new home
For contracts signed on or after 1 February 2012, the NSW statutory warranty period is 6 years for major defects and 2 years for other defects. The NSW Government lists foundations, footings, floors and walls among the major elements of a building (NSW Government, Resolving building disputes). Whether a particular crack is a defect is for the builder, an inspector or a tribunal to decide; this site does not decide it.
The same page says to:
- raise the problem with the builder as soon as you become aware of it
- confirm what was agreed in writing, and keep dated copies
- if it is not resolved, contact Building Commission NSW for dispute resolution; for major defects an inspector may issue a rectification order, and the NSW Civil and Administrative Tribunal is the next step
If the builder has become insolvent, died or disappeared, or had their licence suspended for not complying with a compensation order, a claim may be possible on the Home Building Compensation cover for the job (Service NSW, Home building compensation cover).
An independent foundation inspection or engineer’s report documents what is moving and why, which helps whichever route applies. Repairs after the structure is stable are covered under foundation crack repair, and published repair prices are in the underpinning cost guide.
Frequently asked questions
My new home has fine cracks after a few months. Is it faulty?
Not necessarily. Fine cracks under 1 mm are classed as needing no repair in CSIRO’s reproduction of AS 2870 Table C1. Measure, photograph and date them; report them in writing if they keep growing.
My builder says all new homes crack. Is that true?
Some movement is expected in the first months, per CSIRO, but that does not answer whether a particular crack is a defect. Put the concern in writing and keep records.
What if the soil report seems wrong for how the house is behaving?
Ask the builder for the site classification report and footing design. An independent geotechnical engineer can review them and, if needed, test again.
Request a quote if you want an independent licensed contractor to inspect and document the movement.
Sources
- CSIRO, Foundation Maintenance and Footing Performance (2024, PDF): construction settlement, garden watering, AS 2870-2011 Table C1 reproduction; checked 15/11/2026
- Standards Australia store, AS 2870-2011: scope of the standard, status pending revision; checked 15/11/2026
- ABCB, NCC 2022 Housing Provisions Part 4.2: sites requiring AS 2870; checked 15/11/2026
- NSW Government SEED, Soil Landscapes of the Wagga Wagga 1:100,000 Sheet: foundation hazard ratings; checked 15/11/2026
- NSW Government, Resolving building disputes: statutory warranty periods, major elements, dispute steps (updated 4 September 2026); checked 15/11/2026
- Service NSW, Apply for home building compensation cover: when HBC can be claimed; checked 15/11/2026